Optimize your production
Good production planning is the foundation for optimal workflow. With BIM4Production®, creating the smartest production plan is a breeze. Load the BIM model (preferably as an IFC file), and BIM4Production® takes care of the rest—from machine control to element labels.
In the production of prefabricated building elements, everything revolves around planning
In BIM4Production®, the complex field of planning is addressed through three modules: Task & Resources, Production, and Logistics. In Flow, planning is set up from a high-level to a detailed level across projects, (sub)tasks, milestones (goods receipt), and resources such as: departments, employees, machines, products, revenue, etc.
Some other features:
- Add project planning
- Edit project planning
- Manage task schedules
- Manage resources
- Manage custom fields
- Turn auto-scheduling on or off
Work from a single, clear schedule
The biggest risk in any project is having separate sub-schedules in individual Excel files. That’s why BIM4Production® operates from a single source of truth. This ensures that everyone involved in the project has access to the same clear and organized schedule. If something changes, everyone is immediately informed.
Visual production planning per production line
Machines on the production line can often be controlled based on a BIM model (IFC). By configuring this intelligently, your production site will operate in a virtually automated manner. Furthermore, by building in checks at crucial points during the production process, you guarantee quality. Employees can easily perform these checks via the production work screen.
Want to work from a single source of truth for planning?
Curious about how we ensure a single source of truth for your production planning? We’d be happy to tell you more during a no-obligation introductory meeting. Want to see how it works? Then watch our video on flow in prefab production.
Schedule an introduction7463 PJ Rijssen
BTW: NL811764916B01