The Holy Grail of Industrial Construction

"The Myth of the Holy Grail"—American author Dan Brown has written a bestseller about it. Depending on which myth you follow, the Holy Grail is described as a cup, bowl, spearhead, or gemstone said to possess supernatural powers. Has “planning” become the holy grail for manufacturers of prefabricated building components?

BIM4Production Planning Portal

A single production schedule is not a myth, but a demonstrable truth

The dream of many industrial component manufacturers is to be able to plan and produce just-in-time. It turns out to be a dream that often turns into a nightmare. The reason? Simply because at most manufacturing companies, production dictates the schedule, rather than the schedule driving production. It is undesirable to have a schedule that is “set in stone” six to ten weeks in advance. Another cause is “uncertainty” resulting from the lack of a single, definitive plan.

Excel Experts and Planning Wizards

You can easily see this in day-to-day practice. Different departments have separate schedules, which creates multiple “truths.” Excel is the magic formula here; planners act as Excel knights and production managers as planning wizards. This makes (production) planning anything but flexible. Projects are constantly shifting, and if you aren’t flexible in your planning, you run the risk of always producing at the wrong time—with all the consequences that entails. The shorter the lead time between production and delivery, the easier it is to adjust the schedule so that you produce exactly what you’re delivering. An added benefit: this also prevents unnecessary inventory of finished goods.

Integrated production planning and control.

Industrial component manufacturers benefit from up-to-date planning based on real-time data from logistics and production processes. The question “When must what be delivered, and to what quality standard?” calls for a fundamentally different approach to everything that influences production. Planning is an essential component of this. There is a growing demand for a single, integrated planning system, combined with integrated production control—from high-level to detailed.

The BIM4Production® platform integrates both the planning and control of production (via MES and including quality control) as well as logistics planning. In addition, the platform automates various tasks involved in planning and production. There is only one “single source of truth,” but it can be viewed in various forms. In the high-level phase, a project is planned in terms of lead time. In this phase, for example, the system automatically calculates which steps must be completed to have the final BIM model ready on time, so that production and delivery can proceed on schedule based on that model. Once the BIM model is received, this is recorded as a step—even if it arrives too early or too late. Based on these clear milestones (the number and names of which each manufacturing company can determine and define for itself), a detailed schedule is created in which the essential steps are monitored as part of the workflow (ensuring a smooth progression).

Production Based on Planning in the Delivery Sequence

As soon as engineering is complete, production planning begins, and the platform facilitates component planning as well as production and logistics planning down to the smallest details. The resulting production flow also incorporates quality control and assurance (for each component!). Through an overall schedule, you can get an overview of all the various ongoing projects in a single view. At any time of day, you have insight into the production flow, producing what you can deliver in the correct delivery sequence.

The revolutionary data models within the BIM4Production® platform handle all the data shared back and forth between the various production steps. This includes simple start/stop notifications or quality checks, as well as data shared with other systems, such as the ERP system.

BIM4Production graphic for planning, production and transport

Is planning the Holy Grail of prefabrication?

We’d rather reserve those mythical messages for Brown’s *The Da Vinci Code*. But there’s no denying that smart, integrated planning is absolutely essential in the production environment for prefabricated building components.

BIM4Production® integrates, facilitates, and coordinates based on a single source of truth, thereby contributing significantly to achieving optimal workflow.

Not a myth, but a demonstrable truth.

Get the flow

BIM4Production®: Ensuring optimal flow.